2026 PAVEMENT MANAGEMENT PROGRAM

Project Overview

The City of Burien is responsible for repairs and maintenance of approximately 137 center line miles of paved roads (residential 78%, collector 13%, arterial 9%).

The annual Pavement Management Program (PMP) consists of pavement preservation applications (crack sealing, micro-surfacing and slurry seal coatings), maintenance items (pothole repairs), together with necessary full reconstruction and rehabilitation pavement overlay projects. The purpose of the program is to reduce the overall long-term cost for maintaining the condition of Burien streets.

Each year projects are selected by reviewing the current Pavement Condition Index (PCI), field inspections, and resident input.

A long road with potholes in the foreground and damage to the road

2026 Pavement Overlay Project

The city will be conducing necessary pavement repairs along 4th Ave SW from 136th Ave SW to 146th Ave SW. The project will consist of full depth road repairs, grind and overlay of new asphalt pavement, and ADA compliant crosswalk improvements.

(See 2026 PMP Project Map)

Project Status

Project Design: January-May 2026
Construction: June-September 2026

Project manager

David Traub,
Capital Projects Manager
(206) 241-4647
[email protected]

 