Eagle Landing Park Stairway Project

Project Status

The stairs were removed and the project was completed in January 2024. The park has been reopened for public use.

Project Overview

The Eagle Landing Park property was acquired in 2002. A commitment for project funding was that no structures would be built that would impact natural sediment delivery to the shoreline, such as bulkheads. Stairs connecting people to the shoreline were constructed in 2005. Starting in late 2014, damage to the stairs was noticed and the stairway was closed to public use due to safety concerns.

In late 2015, lower sections of the stairs were removed because they were falling down the hillside from erosion undercutting. On November 21, 2016, the Burien City Council approved, as part of the 2017–2018 budget, a project to terminate the stairs mid-slope at a platform and remove the lower portion of the stairs.

Since the removal of the lower portion of the stairs, further erosion has occurred. The City Council, engineers, and risk managers all recommended removing the full stairway to reduce risks of a massive failure of the structure and potential harm to park users. 

On August 20, 2018, councilmembers directed staff to proceed with the removal of stairs. In 2019, staff began work with contractors and consultants to evaluate options for dismantling the stairs. In 2020, the City received permission from the granting agency, Washington Recreation and Conservation Office (RCO), to remove and not replace the stairs to the beach. In the fall of 2020, the City Council approved funding for a capital project to remove the stairs.

The site is frequently monitored and evaluated for hillside stability by geotechnical engineers and arborists. The stormwater project completed in 2021 helped improve runoff at this park, but with all steep slopes there are many hydrologic issues, including stormwater, groundwater, and seeps in the hillside, that contribute to ongoing erosion and potential slides. Beach erosion also contributes to the erosion of the toe of the slope.

There is longer be an access point to the beach following the stairway removal. However, the City will continue to maintain a trail and viewpoints for the public to use and enjoy.

Project Documents

Geotechnical reports about Eagle Landing Park:

 

Updated June 20, 2024