SW 165th St Stormwater Improvements Project
Project Name: SW 165th St Stormwater Improvements

Scheduled Start Date: 
Construction – early July 2017

Scheduled Completion Date:  October 2017

Project Manager:  Dan O'Brien, 206-248-5538 or

Contractor:  Reed Trucking & Excavating, Inc.

Brief Overview:  Burien Stormwater staff is currently working on a road and stormwater improvement project on SW 165th St, between 16th Ave SW and 19th Ave SW, in the Gregory Heights neighborhood. This street has experienced years of pavement deterioration and seasonal flooding, due to insufficient drainage capacity and poor quality soils. This project will construct a new roadway, along with new stormwater pipe and several Low Impact Development features, including bioretention (i.e. rain gardens). This new stormwater infrastructure will alleviate seasonal flooding on private property that has occurred for many years by rerouting flow out of resident's backyards and into the new pipe in the roadway.

Road closures and detours can be expected, although local access will be maintained.

Project Status:  Project has been awarded, and the City is working with the contractor to prepare for the start of construction.



400 SW 152nd St, Suite 300  /  Burien, WA 98166  /  Ph: (206) 241-4647  /  Fax: (206) 248-5539
Home  /  Contact Us  /  Sitemap  /  Translate Spanish  /  Accessibility  /  Copyright  /  Powered by CivicPlus
City Hall Hours: Monday - Friday 8:00 am to 5:00 pm