2017 Burien Slurry Seal

Project Name: 2017 Slurry Seal

Scheduled Start Date: 
Design – Winter/Spring 2017, Construction – Summer 2017

Scheduled Completion Date: Late Summer/Early Fall 2017

Project Manager:  
Brian Victor, (206) 248-5533, 

Contractor:    To Be Determined

Brief Overview:  Slurry seal is a cost effective tool for extending the pavement life on residential and low volume streets. Typically, this form of roadway maintenance is applied to streets that are in fair to good condition.    
Please refer to our Burien FAQ section (right side of this page) for more information on Slurry Sealing.

Project Status: NewStreet selections for the upcoming 2017 slurry seal are in the following: Salmon Creek, Beverly Park, and Evansville neighborhoods.  Please refer to the map below of planned streets (to be finalized in the next few weeks). In April, selected streets will be finalized. At that time, postcards will be mailed to residents in these areas to inform them of the upcoming work that will be scheduled anytime between July to the end of August.  Further information will be mailed several weeks in advance and 72-hours before actual work to inform residents of final dates and important notices.
2017SlurrySites_.png

slurry.jpeg20160823_134737w.jpg
 21st Ave S (S 124th) - 2015  SW 158th St (10th Ave SW) - 2016

SlurrySeal2016.jpg

Please read the Burien Magazine article (Summer 2016 edition)

400 SW 152nd St, Suite 300  /  Burien, WA 98166  /  Ph: (206) 241-4647  /  Fax: (206) 248-5539
Home  /  Contact Us  /  Sitemap  /  Translate Spanish  /  Accessibility  /  Copyright  /  Powered by CivicPlus
City Hall Hours: Monday - Friday 8:00 am to 5:00 pm