2017 Burien Slurry Seal

Project Name: 2017 Slurry Seal

Scheduled Start Date: 
Construction – August 7

Scheduled Completion Date: August 21

Project Manager:  
Brian Victor

Contractor:   Blackline Inc.

Brief Overview:  Slurry seal is a cost effective tool for extending the pavement life on residential and low volume streets. Typically, this form of roadway maintenance is applied to streets that are in fair to good condition.    
Please refer to our Burien FAQ section (right side of this page) for more information on Slurry Sealing.

Project Status: New - SLURRY WORK IS DONE!

Remaining work are: construction punch list items; striping; sweeping.  Contractor will perform its first sweep of any loose aggregate on August 15.  Another will occur three weeks later. Then a final sweep in three months.

Reminder: the slurry sealed coating may still be soft over the next week or so.  Please drive slower. Avoid "power steering" turns while stopped or parked when possible.

For any questions on this work, please refer to the FAQ section or call.

Burien Postcard 2-2017 Map v4.jpg

                                  Final 2017 Street Selections for Slurry Seal

slurry.jpeg20160823_134737w.jpg
 21st Ave S (S 124th) - 2015  SW 158th St (10th Ave SW) - 2016

SlurrySeal2016.jpg

Please read the Burien Magazine article (Summer 2016 edition)

400 SW 152nd St, Suite 300  /  Burien, WA 98166  /  Ph: (206) 241-4647  /  Fax: (206) 248-5539
Home  /  Contact Us  /  Sitemap  /  Translate Spanish  /  Accessibility  /  Copyright  /  Powered by CivicPlus
City Hall Hours: Monday - Friday 8:00 am to 5:00 pm